Datong Street in Xining City Mo Lu Bridge closed construction a year

due to the construction of the Xining Central Plaza North expansion project, Datong Street bridge renovation project will be carried out. The reporter learned that, from October 17th onwards Xining city on Datong Street West and Mo road bridge closed the whole construction period of one year, during the prohibition of motor vehicles and pedestrians.

it is understood that the closed section of Datong Street West (Datong Street and comity street intersection to the Yangtze River Road and Bridge (MO) Lu Xing Hai Lu to the Yangtze River Road). The closed time from October 17, 2012 to October 16, 2013, closed during Datong along the street, along the street and road bridge is comity things on both sides are not to park any motor vehicle and non motorized vehicle. Go to Datong Street direction by Changjiang Road vehicles prohibited right will be replaced by straight; from North Street via Datong Street to the direction of the Yangtze River Road vehicles will be changed to North Street by 71 road to the Yangtze River Road; comity street from south to north to the Datong Street vehicle will turn around; Mo Road bridge closed, please make a detour along the pedestrian passing Bridge Xing sea or the Yangtze River road. (author: Zhao Linsong)

 

Leave a Reply

Your email address will not be published.Required fields are marked *